Sunday, November 6, 2011

Team Report Reflection

I think our group was successful. I felt like we were successful because we all got along and because of that we were all willing to put effort into our assigned sections of the project. Also, we all thought our idea was a really good one so that made it easier to want to do the work for the project.

In the beginning two huge challenges were that one, some of the group were unable to meet at the designated times so that made it challenging because we had to be in contact by email, which was fine, but got a little confusing at times. Also, another challenge we faced was someone not stepping up and being the leader of the group because we definitely needed some guidance and a push in the right direction.

By the end of the project I think our biggest challenge was that people got lazy and forgot about deadlines and it became one person doing a lot of the work. I think the reason people got lazy was because the deadlines kept getting pushed back and then no one could remember what was due when. We had to keep reminding each other and it just got a little tense at one point.

We overcame the 2 challenges from the beginning because one we finally realized that we don't need to do every part of the project with everyone in the group. People ended up breaking off and doing their own part which helped because not all of us had time to do everything together. This worked out well for us because it ended up being easier to put everything together in the end. We also stayed in contact over email and everything we had we sent to each other. Everyone was always on the same page. I think Gary finally stepped up to guide and help us get to where we needed to be. He made sure that we gave him everything at one time so that he could put everything together and make it look professional.

As for the last challenge I don't think we overcame it, but fortunately the project is pretty much over. Like I said before I think the deadlines had a lot to do with this last challenge. In the beginning we had everything done by each deadline, but once they all started getting pushed back we started getting more lazy and forgetting about them.

My contributions to the project were helping with the survey and writing up the Solutions section of the proposal. I think I was successful. Gary did all the editing for the proposal and I'm pretty sure didn't change much of my section.

I don't think I would do anything differently. I was very happy with the group and all of their contributions and I think we did the best that we could in the time given. I think I would probably try and step up more and put more effort into the project.

I would give my team an A because not only did we work well together as a team but we also worked with all the challenges that we faced. I think everyone made an effort to make our proposal look and sound professional.